Some construction sites in Weifang were notified that bare soil coverage was not in place.

In recent days, in accordance with the relevant deployment requirements of Weifang Municipal Party Committee and Municipal Government, the party group of the Municipal Housing and Construction Bureau held a meeting to implement it, and set up three inspection teams to conduct on-site inspections at construction sites in various districts. After inspection, it was found that the bare soil coverage of some construction sites was not in place and the local earthwork coverage was not strict, so it was notified and rectified within a time limit.

On the night of April 20th, the inspection team of the Municipal Housing and Construction Bureau conducted on-site inspections on 11 construction sites and 3 municipal sites in Kuiwen District, High-tech Zone and Hanting District respectively. After inspection, it was found that the bare soil coverage of some construction sites was not in place and the local earthwork coverage was not strict.The relevant information is hereby notified as follows:

I. Construction site

Project name: Central Royal Garden Phase II, Kuiwen District

Owner: Weifang Wen Liang Jiahao Real Estate Co., Ltd.

Construction unit: Qingdao Bohai Construction Group Co., Ltd.

Supervision unit: Shandong Qingang Engineering Construction Supervision Co., Ltd.

Existing problems: (1) The bare soil coverage of the construction site is not in place; (2) The road is muddy and not washed.

Second, the municipal construction site

1. Project name: Huixiang Road Project

Construction unit: Housing and Urban-Rural Development Bureau of Hanting District, Weifang City

Construction unit: Weifang Changda Construction Group Co., Ltd.

Supervisor: Shandong Changlong Construction Consulting Co., Ltd.

Existing problems: local earthwork coverage is not strict.

2. Project name: Meiyuan Street (Weixian Middle Road-Zhiyuan Road, Huixian Road-Yonghui Road)

Construction unit: Housing and Urban-Rural Development Bureau of Weifang High-tech Zone

Construction unit: Weifang Changda Construction Group Co., Ltd.

Supervision unit: Weifang Engineering Construction Supervision Co., Ltd.

Existing problems: (1) The bare soil coverage of the construction site is not in place; (2) No cleaning staff was arranged to clean the car body, and there was mud on the road.

All districts and municipal development zones are requested to promptly rectify and implement in accordance with the principle of territorial management, and the rectification shall be reported to the Municipal Housing and Construction Bureau within 3 days. If there are still problems such as inadequate rectification within the time limit, relevant enterprises and responsible persons shall be given administrative punishment according to laws and regulations.

Contact: Du Guangyue; Tel: 15949752337;

Email: wfszfcxjsjzlaqk@wf.shandong.cn.

Weifang housing and urban construction bureau

April 21, 2020

On April 21st, the inspection team of the Municipal Housing and Construction Bureau conducted on-site inspections on 43 construction sites, 2 municipal sites and 3 demolition sites in Kuiwen District, High-tech Zone and Hanting District respectively. After inspection, it was found that some construction sites did not have public signs for prevention and control of dust pollution, the construction roads were not fully hardened and covered, the hardened roads were seriously dusty, wet operation was not adopted, the coverage of construction waste was not in place, the coverage of bare soil was not in place, and the coverage of dust-prone materials was not in place.The relevant information is hereby notified as follows:

I. Construction site

1. Project name: Chunjing Garden in High-tech Zone

Construction unit: Shandong Dingtai Real Estate Development Co., Ltd., Weifang High-tech Industrial Development Zone Qingchi Street Dongligu Community Residents Committee.

Construction unit: Weifang Institute of Technology Construction and Installation Company

Supervision unit: Weifang Tianpeng Construction Supervision Co., Ltd.

Existing problems: (1) There is no public notice board for dust pollution prevention on site; (2) Construction waste coverage is not in place; (3) The area of hardened road is seriously dusty.

2. Project Name: 1# Residential Building in East Zone of Wanghou Jiayuan, High-tech Zone

Construction unit: Wangjiahoumeng Community Resident Committee of Qingchi Street Office in High-tech Zone

Construction unit: Weifang Thai Construction Co., Ltd.

Supervision unit: Weifang Tianyuan Engineering Construction Supervision Co., Ltd.

There are some problems: (1) the cleaning of the accumulated dust in the field is not in place; (2) The mixing machine is not protected against dust.

3. Project Name: Yuyuan Project in Kuiwen District

Construction unit: Weifang Chongwen Real Estate Co., Ltd.

Construction unit: Weifang Changda Construction Group Co., Ltd.

Supervisor: Weifang Blueprint Project Management Co., Ltd.

The existing problems are: (1) the building materials in the construction site are piled up in disorder; (2) The protective net coverage is not in place.

4. Project name: No.6 Xiafei, Hanting District

Construction unit: Weifang Jiarun Real Estate Co., Ltd.

Construction unit: gaomi city Guang ‘an No.1 Construction Engineering Co., Ltd.

Supervision unit: Weifang Tianpeng Construction Supervision Co., Ltd.

Problems: During the construction of supporting facilities, the exposed earthwork of the site was not covered.

Second, the municipal construction site

1. Project name: Fudong Road, High-tech Zone (Jiankang Street-Yuqing Street)

Construction unit: Housing and Construction Bureau of Weifang High-tech Zone

Construction unit: Weihao Construction Group Co., Ltd.

Supervisor: Weifang Blueprint Project Management Co., Ltd.

There are some problems: (1) the coverage of dust-prone materials is not in place; (2) The bare soil coverage in the field is not in place.

2. Project name: Xinchang 1st Road (Yuqing Street-Xinchang Street) under Qingyin Expressway in High-tech Zone.

Construction unit: Housing and Construction Bureau of Weifang High-tech Zone

Construction unit: Shandong Rongchang Road and Bridge Engineering Co., Ltd.

Supervision unit: Shandong Weida Engineering Project Management Co., Ltd.

There are some problems: (1) Partial bare soil coverage is not in place; (2) Sprinkling dust is not in place.

Third, the demolition site

1. Project Name: Demolition Project of Wolong Street South-Wenhua Road East Area in Kuiwen District

Responsible unit: Kuiwen District Collection Office

Existing problems: (1) The construction waste of the demolition site is not covered; (2) No dust suppression measures have been taken.

2. Project name: Wangjia Demolition Area, Ershilipu, Kuiwen District

Responsible unit: Ershilipu Street, Kuiwen District

Existing problems: (1) The construction waste at the demolition site is not covered; (2) No dust suppression measures have been taken.

3. Project name: Jianzhuang Village, Xisi, Kaiyuan Street Office, Hanting District

Responsible unit: Kaiyuan Street Office, Hanting District

Existing problems: (1) The earthwork at the demolition site is bare and the dust is heavy.

Fourth, bare land

Venue: Open space west of Chanhe River and south of Fuqing Street, High-tech Zone.

Existing problems: garbage and bare soil piles are not covered in place.

All districts and municipal development zones are requested to promptly rectify and implement in accordance with the principle of territorial management, and the rectification shall be reported to the Municipal Housing and Construction Bureau within 3 days. If there are still problems such as inadequate rectification within the time limit, relevant enterprises and responsible persons shall be given administrative punishment according to laws and regulations.

Contact: Du Guangyue; Tel: 15949752337;

Email: wfszfcxjsjzlaqk@wf.shandong.cn.

Weifang housing and urban construction bureau

April 22, 2020

Regarding the setting off of fireworks and firecrackers during the Spring Festival, notices were issued throughout Taizhou.

Spring Festival is approaching.

Can our city set off fireworks and firecrackers during the Spring Festival this year?

How to determine the discharge time and place?

Let’s look at the local notices together.

Jiaojiang

Allowable discharge time

February 9, 2024 (New Year’s Eve), February 10 (the first day of the first month) and February 24 (Lantern Festival) are all day.

No discharge area

East to Donghuan Avenue, south to Development Avenue, west to Center Avenue, and north to Yunxi Road.

Centralized discharge point

Haimen Street: the entrance square of Zhongshan Branch of Industrial and Commercial Bank of China, the parking lot in the south of Taowang Food Market, the parking lot of Baiguo Jinyue Plaza and the open space in the east of Minhui Food Market.

Baiyun Street: Jiangbin Park Qianli Haitang Monument Platform, Zhongshan Square.

Jiazhi Street: Taizhou Sports Center Square, Jiaojiang District Gymnasium Square, subgrade of the west extension section of Development Avenue (south block of Huajing Temporary House).

Huangyan

Allowable discharge time

It is allowed to be set off for 3 days, namely, New Year’s Eve (February 9), the first day of the first month (February 10) and the fifteenth day of the first month (February 24).

Forbidden range

The forbidden area in huangyan district city is Erhuan East Road in the east, Erhuan South Road in the south, Laodong South Road-century avenue-Erhuan West Road in the west and Erhuan North Road in the north.

At the same time, the following points can be considered as combustible areas in the no-burn zone:

1. South Square of Milan Hotel, Xiaodongmen, Dongcheng Street (Xiaodongmen Road-Huancheng East Road-Dongguan River);

2. Binjiang Park in Dongcheng Street (north of Jianshe Building);

3. Yongning Park in Xicheng Street (east of Yongning Happiness Science Museum);

4. Point 1, Jiangbei Park, Xicheng Street (south of Wuyue Square);

5. No.2, Jiangbei Park, Beicheng Street (west of Yongningjiang Hotel).

roads and bridges

Allowable discharge time

Fireworks and firecrackers can be set off on three days throughout the year: New Year’s Eve, the first day of the first month and the fifteenth day of the first month.

Forbidden range

East to Tailong Street, south to Xialiqiao West Road-Xin ‘an South Street-Xin ‘an West Street, west to Shangcheng Street, and north to Luqiao Avenue.

Linhai

Allowable discharge time

The day before Lunar New Year’s Eve, New Year’s Eve, the first day of the first month, the seventh day of the first month, the eighth day of the first month, the ninth day of the first month, the fourteenth day of the first month and the fifteenth day of the first month.

Forbidden discharge range

Wenling

Allowable discharge time

Lunar New Year’s Eve, the first day of the first month, the third day of the first month, the fourth day of the first month, the eighth day of the first month and the fifteenth day of the first month, totaling 6 days.

Forbidden range

Taiping Street, Chengdong Street, Chengxi Street and Hengfeng Street are areas where the sale and discharge of fireworks and firecrackers are prohibited, and fireworks and firecrackers can be set off in other specified places.

Yuhuan

Allowable discharge time

From 0: 00 on December 24th (February 3rd) of the lunar calendar to 24: 00 on the 15th of the first lunar month (February 24th) of the following year.

Forbidden range

Fireworks and firecrackers are prohibited in cultural relics protection units, transportation hubs such as stations and docks, production and storage units of inflammable and explosive materials, medical institutions, schools at all levels, nursing homes, forest fire prevention zones, power transmission and transformation facilities safety protection zones, party and government organs at all levels, institutions and other places.

balcony

Allowable discharge time

In the restricted area, fireworks and firecrackers are allowed to be set off on the day before Lunar New Year’s Eve, the day of Lunar New Year’s Eve, the first day of the first month, the fourteenth day of the first month and the eighteenth day of the first month, and all other times are prohibited.

Forbidden range

The restricted discharge areas in Tiantai City are: Luoxi, Shifeng Sixth Bridge and Eyuan in the east, New National Highway 104 and New Provincial Highway 62 in the south (at the traffic lights of Gangtou in Tang and Song Dynasties), Xiakeshan Village (Yongchang Road) in the west, and Sanmaoxi and Hanshan Road in the north (the chengguan section of New Provincial Highway 60, including Tiandu Garden and Xiushui Villa).

Xianju

Allowable discharge time

The day before New Year’s Eve, New Year’s Eve, the first day of the first month, the eighth day of the first month, the fourteenth day of the first month and the fifteenth day of the first month.

Forbidden range

Xianju City: Crossing Chengbei Road-Crossing Chengzhong Road-Huancheng South Road-Anzhou North Road-Chengbei West Road-Taihe North Road-Huancheng North Road.

Hengxi Town: the area surrounded by Linshi Line-Yong ‘an Road-Dongxi Street-Zhongxin Road.

sanmen

No sale and no release time

No sale and no release area Since January 17, 2024, fireworks and firecrackers have been banned for the whole year.

Forbidden range

Densely populated areas: Panlong Park, Xinhu Park and Xishan Park;

Offices of state organs, cultural relics protection units, key fire prevention areas such as mountains and forests, medical institutions, kindergartens, schools, pension institutions, libraries and other places determined and announced by the county government.

Taizhou Bay New Area

Allowable discharge time

February 9 (New Year’s Eve), February 10 (Spring Festival) and February 24 (Lantern Festival) are all day.

Centralized fixed-point discharge

Haihong Street Discharge Point: 50 meters northwest of Woz, Zhejiang (Ankang Road West).

The streets within the scope of non-built areas shall be stipulated by themselves in accordance with the spirit of urban meetings.

50 meters northwest of Woz, Zhejiang (Ankang Road West)

In addition, it should be noted that

The following places in the city and within 100 meters

Are forbidden to burn.

It is forbidden to set off fireworks and firecrackers in the following places and within 100 meters:

(a) the office of state organs;

(two) cultural relics protection units, cultural relics protection points, historical and cultural blocks, historical buildings protection scope;

(3) Units that produce, manage and store inflammable and explosive articles;

(4) the location of military facilities;

(five) key fire prevention areas such as forests;

(6) Medical institutions, kindergartens, schools, institutions for the aged, libraries, archives, museums and places for religious activities;

(seven) in the safety protection zone of power transmission and transformation facilities;

(eight) stations, docks and other transportation hubs, rail transit and railway line safety protection zones;

(9) Within the airport clearance protection zone;

(10) Commodity trading markets and construction sites;

(eleven) high-rise buildings and underground buildings;

(twelve) other places determined and announced by the people’s governments of cities and counties (cities, districts).

The first explosion was successful!

2024-02-06

Free parking in the city during the Spring Festival!

2024-02-06

The smell of meat in the twelfth lunar month is a growing flavor of the year.

2024-02-05

Original title: "It is related to the discharge of fireworks and firecrackers during the Spring Festival, and notices are issued throughout Taizhou"

Read the original text

Notice of Beijing Intellectual Property Office on Declaring the Establishment of the Second Batch of Technology and Innovation Support Center (TISC) in Phase II

All relevant units:

  According to the requirements of the China National Intellectual Property Administration Office’s Notice on Initiating the Recommendation of the Establishment of the Second Batch of Technology and Innovation Support Centers (TISC), and in order to thoroughly implement the spirit of the important instructions of the Supreme Leader General Secretary on forming an intellectual property public service system that will benefit the people and the people, the Beijing Intellectual Property Office is now organizing the application for the establishment of the second batch of technology and innovation support centers (TISC). The relevant matters are hereby notified as follows:

  First, the reporting conditions

  The subject of application is intellectual property information service institutions engaged in the fields of patents, trademarks, geographical indications and designs, including social information service institutions such as universities, scientific research institutions, public libraries, scientific and technological intelligence agencies, industry organizations, productivity promotion institutions in industrial parks, and various legal entities such as public service institutions of intellectual property systems at all levels. An institution that meets the basic conditions stipulated in Article 6 of the Implementation Measures for the Construction of Technology and Innovation Support Center (TISC) (Guo Zhi Ban Fa Fu Zi [2019] No.27), and can carry out relevant work or play a supporting role in promoting the transformation and application of innovation achievements, promoting intellectual property pledge financing, promoting strong chain efficiency in key industries, cultivating and popularizing patent-intensive products, supporting national strategic scientific and technological research, guiding enterprises to defend their rights overseas and early warning of infringement, etc.

  According to the public welfare orientation and nature of TISC, market-oriented information service institutions that only provide commercial services are not recommended; Do not repeatedly recommend institutions that have been approved to become national intellectual property information service centers in colleges and universities. Institutions that have filed national public service outlets for intellectual property information are given priority under the same conditions.

  Second, the declaration and audit procedures

  All reporting units fill in the application materials and submit them to the Beijing Intellectual Property Office. The Beijing Intellectual Property Office will carefully examine the submitted materials, and in principle, recommend no more than five local units with good basic conditions and strong service capabilities as the second batch of TISC recommendation candidate institutions in the second phase and submit them to China National Intellectual Property Administration.

  China National Intellectual Property Administration will review the application materials in accordance with the established procedures, organize expert review, and conduct field research as needed. Finally, China National Intellectual Property Administration and WIPO will jointly determine the list of the second batch of TISC preparation organizations in the second phase and publish it on the official website.

  Third, the reporting requirements

  Please fill in the Recommendation Form for the Establishment of Technology and Innovation Support Center (TISC) (see attachment) carefully, and ensure that the contents are true, accurate and complete, and submit it to the mailbox of International Exchange and Cooperation Office of Beijing Intellectual Property Office (guojichu@zscqj.beijing.gov.cn) before closing on March 22nd. If it is recommended after examination, the Municipal Intellectual Property Office shall notify the recommended unit to enter all information items in the recommendation form through the public service management system of the National Intellectual Property Public Service Network (https://ggfw.cnipa.gov.cn/gl/), and submit the sealed PDF version and the electronic WORD version of the recommendation form.

  I hereby inform you.

Beijing Intellectual Property Office    

March 18th, 2024  

  (Contact: Yang Qi; Tel: 55536355)

Inspection bulletin

City Establishment Office Supervision Daily

On September 5th, the Municipal Establishment Office conducted daily inspections on 47 points, including communities, communities, schools, parks, primary and secondary roads, back streets and alleys. The inspections found that there were 144 problems in some points, such as the garbage was not cleaned up in time, flying wires were charged, small advertisements were not cleaned up, and loess was exposed in many tree pools along the way.

First, create a point inspection situation

(1) Yujiang District

1. Yangliu Road (time limit for rectification: September 7th)

There are problems: (1) the font of a signboard is damaged; (2) There is no public service advertisement.

2. China schistosomiasis memorial hall (rectification time limit: September 7th)

There are some problems: (1) The bait station failed to deliver bait on time; (2) a flower bed board is damaged; (3) A public service advertisement faded seriously.

3. Shixin Xiangfu (Baita Community) (time limit for rectification: September 7)

The existing problems are: (1) The loess in the green belt is exposed; (2) Many construction wastes were not cleaned up in time; (3) Many small advertisements have not been cleaned up; (4) The track board is damaged.

4. Trust-mart (Guoxi Avenue Store) (time limit for rectification: September 7)

Problems: (1)LED display screen is damaged; (2) There are few fire-fighting facilities on the first floor and their distribution is unreasonable; (3) There is a serious shortage of fire-fighting facilities on the second floor.

5. Yidu Community (Yanhe Community) (time limit for rectification: September 7)

Existing problems: (1) A lot of sundries are piled up in disorder; (2) Many small advertisements have not been cleaned up; (3) The rat bait station is damaged.

6. Yanhe North Road (rectification time limit: September 7)

There are some problems: (1) Loess in many tree pools along the way is exposed; (2) A public service billboard collapsed.

(2) Yuehu District

7. Eagle King Huandong Garden (Dongfeng Lane Community) (time limit for rectification: September 7)

Existing problems: (1) uncivilized drying; (2) the publicity column is blocked; (3) Overflow of bait from rat bait station.

8. Dongfeng Lane Community (time limit for rectification: September 7th)

There are some problems: (1) The exhibition content of the new era civilization practice station was not cleaned up in time; (2) The contents of vector control are incorrectly stated.

9. Shatangshi Nanyuan (Shatangshi Community) (time limit for rectification: September 7)

Problems: (1) The setting of fire extinguishers is not standardized; (2) illegally growing vegetables; (3) The external facade of the trash can is dirty and smelly; (4) Flying wire charging.

10. Minxin Home (Minxin Community) (time limit for rectification: September 7)

There are some problems: (1) the public service advertisement is damaged; (2) The number of rat bait stations is too small; (3) The flower bed tiles are damaged; (4) Loess in many green belts is exposed; (5) Flying wire charging.

11. West Lake Jiayuan (West Lake Community) (time limit for rectification: September 7)

Existing problems: (1) the manhole cover is damaged; (2) The fire extinguisher is not inspected monthly on time; (3) Accessible parking spaces are occupied; (4) The building surplus materials are not cleared in time; (5) Flying wire charging.

12. Century Garden Community (Shopping Mall Community) (Time limit for rectification: September 7th)

There are problems: (1) many small advertisements have not been cleaned up; (2) The accumulated garbage in the green belt has not been cleaned up; (3) The public service advertisement is damaged.

13. Hailiang Capital (Yingxi Community) (time limit for rectification: September 7)

Existing problems: (1) The bulletin board is dirty; (2) The fitness equipment is damaged; (3) Loess in many green belts is exposed; (4) The number of rat bait stations is too small; (5) The garbage at the platform of the building was not cleaned in time.

14. Cangbei Road (Zhaojianong Community) (time limit for rectification: September 7)

Existing problems: (1) occupying the road; (2) The responsibility of "three guarantees in front of the door" falls off.

15. Xinxin Road (time limit for rectification: September 7)

There are some problems: (1) Loess in many tree pools along the way is exposed; (2) Multi-outlet operation.

(3) High-tech Zone

16. Jinqiao Community (time limit for rectification: September 7th)

There are some problems: (1) The bait station failed to deliver bait on time; (2) The mini fire station is not provided with a monthly inspection card.

17. Huamu Road (time limit for rectification: September 7)

Existing problems: (1) store operation; (2) Loess in many tree pools along the way is exposed; (3) Garbage bins are not classified; (4) Oil stain on the wall.

18. Yingxi North-South Passage (rectification time limit: September 7)

Problems: the font of the enclosure public service advertisement is damaged.

19. Caofang Lijia (Bailu Community) (time limit for rectification: September 7)

There are some problems: (1) many garbage were not cleaned in time; (2) the banner falls off; (3) the cable is messy; (4) Many small advertisements have not been cleaned up.

20. Ruihe International (Jinqiao Community) (time limit for rectification: September 7)

There are problems: (1) flying wire charging; (2) uncivilized drying; (3) Many small advertisements have not been cleaned up.

21. Bailu Community (time limit for rectification: September 7)

Problems: No barrier-free parking spaces are set.

(4) Xinjiang New District

22. Hangong Shangcheng (pontoon community) (time limit for rectification: September 7)

Existing problems: (1) Many sundries are piled up in disorder; (2) 66 health literacy billboards are dirty; (3) uncivilized drying.

23. Longteng Riverside (Zhujia Community) (time limit for rectification: September 7)

Existing problems: (1) uncivilized drying; (2) Small advertisements have not been cleaned up.

24. Xinjiang Dijing (pontoon community) (time limit for rectification: September 7)

Existing problems: many uncivilized drying.

25. Minyue Home Phase I (Zhongyuan Community) (time limit for rectification: September 7)

Existing problems: (1) The garbage in the trash can is overflowing and not cleared in time; (2) Small advertisements are not thoroughly cleaned up.

26. Minyue Home Phase II (Zhongyuan Community) (time limit for rectification: September 7)

Problems: There are many weeds in the community.

27. Evergrande Royal View (Happy Community) (time limit for rectification: September 7th)

The existing problems are: (1) the sewer bypass board is loose; (2) The number of rat bait stations is too small.

28. Happy community (time limit for rectification: September 7)

Existing problems: (1) building materials are piled up in disorder; (2) The public service billboard is skewed.

(5) Municipal Urban Management Bureau

29. Huancheng West Road (rectification time limit: September 7)

There are some problems: (1) Loess in many tree pools along the way is exposed; (2) The cable box is damaged; (3) store operation; (4) The building enclosure is damaged; (5) Many places are overgrown with weeds.

30. Zhanjiang Road (time limit for rectification: September 7)

Problems: (1) The cable box is damaged; (2) Many white garbage in the green belt was not cleaned up in time; (3) Many small advertisements have not been cleaned up; (4) The track board is damaged.

31. Times Square (time limit for rectification: September 7)

Existing problems: (1) the track board is damaged; (2) The setting of mother-infant room is not standardized; (3) there is an uncivilized lying phenomenon; (4) The public service advertisement is damaged.

32. Citizen Square (time limit for rectification: September 7)

Existing problems: (1) the track board is damaged; (2) The signboard is damaged.

33. Anren Street (time limit for rectification: September 7)

Existing problems: (1) the manhole cover is damaged; (2) Pavement sanitation and cleaning are not in place.

34. Longtan Park (time limit for rectification: September 7)

There is a problem: the fly killing device is skewed.

35. Xinjiang Ecological Park (time limit for rectification: September 7)

Existing problems: public service billboards are skewed.

(6) Municipal Bureau of Agriculture

36 Agricultural Technology Extension Center (time limit for rectification: September 7)

Existing problems: (1) the fence is defective; (2) forming a dead corner of sanitary waste for a long time.

Two, to create a special rectification supervision situation

(1) Yuehu District

1. Shaw Primary School (time limit for rectification: September 7th)

Existing problems: (1) Many scattered garbage were not cleaned in time; (2) graffiti on the wall; (3) Many public service advertisements and ditch cover plates are damaged; (4) The rat bait station is damaged and the signboard is missing.

2. No.3 Middle School (time limit for rectification: September 7th)

Existing problems: (1) Many cigarette butts and double-sided adhesive tapes on the wall are not cleaned; (2) Smoking exists in schools; (3) Signs, fitness equipment and iron fence are damaged; (4) The fire cabinet panel is damaged.

(2) Xinjiang New District

3. Binjiang No.1 Phase II (time limit for rectification: September 7th)

Problems: (1) The scattered garbage and broken glass slag in many unit buildings were not cleaned up in time; (2) graffiti on the wall, and small advertisements are not cleaned up; (3) bare wires.

4. No.5 Middle School (time limit for rectification: September 7th)

Existing problems: (1) scattered garbage and ground water are not cleaned up; (2) The picture of public service advertisement is damaged, the lamppost is rusted, the floor drain cover is missing, and no barrier-free signs are found for barrier-free facilities; (3) Loess is exposed in many places in the green belt; (4) There are no screen windows in the canteen, and the fly prevention measures are not in place.

(3) Municipal Education Bureau

5. No.2 Middle School North Campus (rectification time limit: September 7th)

There are some problems: (1) Grade 9 teachers in No.2 Middle School North Campus smoke in the dormitory aisle; (2) Many scattered garbage and cigarette butts were not cleaned in time; (3) Banners, doorframes and door handles of canteen doors are damaged; (4) There is no water saving sign in the bathroom, many accumulated stools are not cleaned, the flushing facilities in the toilet seat are damaged, and the baffle falls off; (5) The fire-fighting facilities of several fire cabinets are missing.

6. No.4 Middle School (time limit for rectification: September 7th)

There are some problems: (1) The doorman did not dissuade the students from riding electric cars without wearing safety helmets; (2) The speed bump is damaged.

(4) Municipal Urban Management Bureau

7. Lotus Market (time limit for rectification: September 7th)

There are some problems: (1) There are no classified garbage bins on the island; (2) Banners and window glass are damaged, and the bait of poisonous rat bait station overflows.

(5) Municipal Health and Health Commission

8. South Hospital of People’s Hospital (time limit for rectification: September 7th)

Existing problems: (1) many ceiling garbage and cigarette butts were not cleaned in time; (2) Indoor smoking exists; (3) The pavement, door panels, green belt guards, warning signs and lighting facilities are damaged, the wall skin falls off, and the landscape pieces are corroded; (4) the bait overflowed from the poisonous rat bait station; (5) The small advertisement in the bathroom was not cleaned, and the bottom cabinet of the sink was damaged.

(6) City Construction Investment Development Co., Ltd.

9. Construction site for the project of resettlement of landlord plot in the north area of Xinjiang New District (rectification time limit: September 7)

Problems: (1) Scattered garbage, piles of garbage and siltation were not cleaned up in time; (2) Signs and enclosures for public service advertisements are damaged; (3) The fire-fighting facilities of the fire-fighting cabinet are missing, and the cover plate of fire extinguisher box is missing.

10. Reconstruction of shanty towns in Xinjiang New District into villages in the north (rectification time limit: September 7)

Problems: (1) Scattered garbage, piles of garbage and siltation were not cleaned up in time; (2) Small advertisements are not cleaned up; (3) Multiple trash cans are damaged; (4) The public service advertisement picture of the ditch cover plate and enclosure is damaged.

11. Construction site of the second phase project of welfare home (rectification time limit: September 7th)

Problems: (1) Scattered garbage and piles of garbage were not cleaned up in time; (2) Small advertisements are not cleaned up; (3) The fire hose of mini fire station is missing; (4) The identification of protective shed of distribution box is damaged.

III. Opinions and suggestions

(a) increase investment, draw inferences from one system to rectify. In view of all kinds of problems existing in many parks, public squares, primary and secondary roads and back streets and alleys in the city, all relevant responsible units should further intensify the creation work, increase investment in the creation of public places, and compact the responsibility of "three-level responsible persons". At the same time, we will systematically rectify similar problems and improve the creation work through rectification.

(2) Intensify efforts and make persistent and strong rectification. In view of the recurrent problems in some communities and communities, such as uncivilized drying, untimely garbage cleaning, littering, and uncleaning of small advertisements, all localities and units should further improve their management level, adopt a "zero tolerance" attitude towards recurring problems, abandon the vague idea of "almost", and make meticulous progress at each point.

Original title: "Inspection Bulletin"

Read the original text

Exclusive! "Lonely Lost" prototype reunion director exposed Andy Lau excited reply


1905 movie network news "Because the world is round, we will meet again. On the 2307th day after the film was released, Guo Gangtang and his son reunited at the end of 24 years. This is the best ending of the movie. May there be no abduction in the world and no separation in the world. "

 

On July 13th, a press conference was held in the Ministry of Public Security, and it was announced that Guo Zhen (registered as Guo Xinzhen), the prototype of the abducted child of The Lost Orphan, was successfully recovered in the "Reunion Action" and a wedding ceremony was held. After that, the producers of The Lost Orphan released a poster to wish Guo Gangtang and his son a reunion. Lei Zekuan, who plays in the film, also specially recorded videos to express his wishes for the reunion of prototype Guo Gangtang and his son.

Andy Lau said, "Through this lens, I hope to tell Brother Guo that I admire your persistence and pay tribute to the efforts of the public security organs for many years. Here, I appeal to all my friends to join me in supporting the anti-trafficking work and hope that more separated families can reunite as soon as possible. "


In response to this incident, 1905 Film Network contacted the director exclusively at the first time.Peng SanyuanShe revealed that after the news of finding her son in Guo Gangtang was announced, she immediately contacted Guo Gangtang and told Andy Lau. Guo Gangtang replied to her, "Elder sister, I can live a normal life now", and Andy Lau at work quickly replied to her with a smiling face and a prayer gesture expression with his hands folded, very excited.



"Guo Zhen, you may be a little confused about the sudden appearance of your biological father, and you don’t know what to do, but you can learn about your father Guo Gangtang’s 24-year journey through many channels, and every step is love for you, so I wish his appearance is not a burden to you, only love itself!" While posting a message of blessing on the Internet, Peng Sanyuan hoped that Guo Zhen would not have too much psychological burden in the face of his biological father.

 

"I want to say to Guo Zhen, don’t have psychological burden, because for him, Guo Gangtang actually came to him with love 20 years late and blessings from many people." "Don’t think too much, just accept such a late love."Peng Sanyuan believed that Guo Gangtang had been psychologically prepared, because he had said in an interview that he would get along with Guo Zhen’s adoptive parents like relatives, and Guo Zhen’s heart would certainly be shaken, so he didn’t want to be affected too much and change his original life track.

 

Recalling the creative process of "Lonely Lost", Peng Sanyuan said that she began to pay attention to the group of abducted children after seeing the relevant reports of Guo Gangtang in 2010, and contacted the Baby Home Public Welfare Website and the Ministry of Public Security’s Abduction Office successively to track the whole situation of abducted children, and started to create this film after a lot of interviews.

 

The ending of Lost Orphan is that Lei Zekuan, the protagonist, embarks on a straight road and continues his difficult journey of finding relatives. Now prototype father and son finally get together, Peng Sanyuan said frankly:This is the real ending of the movie we expected at that time. We don’t want this father to be on the road forever.


The following is an interview record:

 

1905 Movie Network: Have you contacted the parties after you learned about this matter?

 

Peng Sanyuan:Because we have always had a group in Lost Orphan, including Guo Gangtang, and it is in this group that I posted. I told Gangtang that I was very happy, because he was probably very busy the other day. After he made an appointment, he sent me a short message. He said, Sister, I can live a normal life now.

 

1905 Movie Network: How did you reply?

 

Peng Sanyuan:I have 10,000 joys and 10,000 blessings. I really hope that he can return to a normal life track as soon as possible, live a normal life, and stop running around and suffering.

 

1905 Movie Network: After hearing that you knew about this matter, you contacted Andy Lau at the first time.

 

Peng Sanyuan:Yes, I didn’t tell Brother Hua until Guo Gangtang released the news to the media. I sent him a message. I said that the son of the prototype character of Lonely Lost had been found. He quickly gave me a smiling face and then a gesture of prayer. I guess he might be working at that time.

1905 Movie Network: You wrote an article in Weibo, which was not only a blessing to Guo’s father, but also some words to his son. Why do you think so?

 

Peng Sanyuan:Because Guo Gangtang is psychologically prepared for this matter, and Guo Gangtang has been running for more than 20 years, he is always looking forward to the day when he meets his son, so Guo Gangtang doesn’t need psychological construction, but Guo Zhen is different. He was originally in his own normal growth trajectory, and he didn’t know that he was abducted, so the sudden appearance of this matter should be a shock to him. The reason why he didn’t know, adoptive parents must have never told him that he wasn’t his own. If he had, he would have looked for him. Since he didn’t know, this matter would have been very shocking to him.

 

It takes a psychological time for him to accept Guo Gangtang, so I want to tell Guo Zhen not to have psychological burden, because for him, Guo Gangtang actually came to his side with love that was 20 years late and many people’s blessings. Don’t think too much about whether he should return to his biological parents’ home and how to treat his adoptive parents. I don’t think this should be his psychological burden. He just needs to accept such a late love.

 

I think both Guo Gangtang and Guo Gangtang’s family are wise enough to gradually establish parent-child relationship with their children and get along with their adoptive parents as relatives in the future. Because in previous interviews, Guo Gangtang once said that if he found a child, he hoped to get along with his adoptive parents like relatives. Therefore, Guo Gangtang is prepared, while Guo Zhen is not. I hope he can have a relatively normal life track under such a shocking situation and not change his life track.

1905 Movie Network: We saw Andy Lau,When the main creators sent their blessings, the film also sent a reunion poster. Is there anything different in your heart?

 

Peng Sanyuan:I was particularly moved. This is the real ending we expected at that time. We don’t want this father to be on the road forever. Because our original movie ending gave him a straight way forward, a relatively bright way, and gave him a vision. As the master said, if you do more good deeds, you will meet each other when you get together.

 

Because we can’t answer this question, when can he find Guo Zhen and when can he find his son?In 2037 days after the release of our film, they finally met, or by the efforts of the public security department, the happy ending was realized. For us filmmakers, this ending should be a real ending.

 

1905 Movie Network: From the director’s point of view, does this matter have any influence on your future creation?

 

Peng Sanyuan:I hope that each of our works can help and contribute a little to the society. No matter from which angle, it can promote the progress of the society and the kindness and beauty of the people. We still hope to do something for the society through our own artistic creation, and this original intention will not change.


China’s foreign trade is gradually stabilizing and improving the Ministry of Commerce: there is support and pressure.

  Beijing, China, September 11 (Reporter Tong Yatao) According to World Finance, the economic voice of the Central Radio and Television General Station, the latest data shows that in the first eight months of this year, China’s foreign trade import and export gradually stabilized and improved, and the situation was better than expected. Gao Feng, spokesman of the Ministry of Commerce, said at the press conference held on September 10th that the foreign trade situation this year was supportive and stressful.

  According to data released by the General Administration of Customs recently, in the first eight months of this year, the total value of China’s foreign trade import and export was 20.05 trillion yuan, down 0.6% from the same period of last year, and the decline was 1.1 percentage points narrower than that in the first seven months. Exports have achieved positive growth, with a year-on-year increase of 0.8%. At the press conference on September 10th, Gao Feng summarized China’s foreign trade performance in the first eight months of this year as "gradually stabilizing and improving, and the situation is better than expected." As for the foreign trade situation this year, Gao Feng used two words to describe it: support and pressure.

  "On the one hand, it is ‘ Have support ’ . Since the beginning of this year, a series of policies and measures to stabilize foreign trade in the State Council have been continuously implemented, and the policy effects have been continuously released. The demand in the international market has partially picked up, and the PMI index of some major international economies has improved in August. " Gao Feng said, "On the other hand, it is ‘ There is pressure ’ . At present, the global epidemic has not been fully and effectively controlled, and the demand in the international market has shrunk severely. The latest global trade prosperity index released by the WTO has hit a record low, unilateralism and protectionism have risen, and uncertainties and unstable factors have increased significantly. The situation facing China’s foreign trade development is still severe and complicated. "

  Gao Feng introduced that in the next step, the Ministry of Commerce will closely focus on the objectives and tasks of promoting stability and improving quality of foreign trade throughout the year, pay close attention to the implementation of stable foreign trade policies, and ensure that relevant policies benefit market players as soon as possible. "Accelerate the cultivation of new foreign trade formats and new models, guide the gradient transfer of processing trade and stabilize the development of processing trade. Actively promote the innovative development of border trade. Speeding up import trade and promoting the construction of innovation demonstration zone. Support export products to domestic sales. Continue to improve the level of trade facilitation. "

  As a "barometer" of China’s foreign trade, the 128th China Import and Export Fair, the Canton Fair, will be held online from October 15th to 24th, with an extension of 10 days.

  In recent years, with the rapid development and wide application of digital technology, digital economy and trade have flourished and become the highlight of economic development and international economic and trade cooperation in various countries. Data show that in 2019, the added value of China’s digital economy reached 35.8 trillion yuan, accounting for 36.2% of GDP. At the just-concluded 2020 Service Trade Fair, many places and departments have also put forward relevant layout plans to accelerate the development of digital trade.

  Gao Feng introduced that since the beginning of this year, the Ministry of Commerce, together with the Central Network Information Office, the Ministry of Industry and Information Technology and other departments, has studied the framework of digital trade system, put forward a digital trade work plan, and selected the first batch of 12 digital service export bases based on comprehensive evaluation, supported and guided these bases to try first, and promoted the improvement of digital trade policies and systems in the practice of digital trade.

  "In the next step, the Ministry of Commerce, together with the Central Network Information Office and other departments, will continue to push forward the pilot work of comprehensively deepening the innovation and development of service trade, regard digital trade as an important part of the new round of pilot projects, guide relevant pilot areas to actively explore, continuously optimize the allocation of digital resources, and stimulate the development potential of China’s digital economy and trade." Gao Feng said.

Annual Report of Changping District People’s Government of Beijing on Government Information Disclosure in 2021

  This report is compiled in accordance with Article 50 of the Regulations of People’s Republic of China (PRC) Municipality on the Openness of Government Information (hereinafter referred to as the Regulations on the Openness of Government Information).

  I. General situation

  In 2021, the Changping District Government earnestly implemented the Regulations on the Openness of Government Information, continuously expanded the open content, innovated the open forms, improved the open system, strengthened the open supervision, and promoted the open work of government information and government affairs in an orderly manner.

  (A) the implementation of open process specification

  The first is to compile the "Changping District Government Information and Government Affairs Disclosure Work System Manual", refine nine system rules, and standardize the government affairs disclosure work process in the whole region. The second is to strengthen the voluntary disclosure of government information, standardize the setting of government information disclosure columns, and timely release the statutory voluntary disclosure content. Special topics such as "the construction of two districts" were established, and information in key areas such as the approval and implementation of major construction projects, the allocation of public resources, people’s livelihood, law enforcement supervision, and urban and rural construction was actively disclosed, and 3,401 pieces of information were released throughout the year. The third is to optimize the mechanism of disclosure according to the application, and actively respond to the needs of enterprises for government information disclosure. The whole region has handled 923 applications for government information disclosure. The fourth is to strengthen the business guidance for the open work of all units, combine the online business training of the universality of government affairs disclosure with the offline analysis and discussion according to the application difficulties, and promote the continuous improvement of the standardization level of government information and government affairs disclosure in the whole region.

  (2) Strengthen the management of open platforms.

  First, strengthen the construction of the website platform of the district government and improve the application efficiency of data classification management of government websites. Strengthen the construction of information content on government websites to ensure timely information release and update. The second is to complete the development and testing of the "Pingping" function module of the government service intelligent robot and the development of WeChat applet, expand the knowledge base data by more than 14,000 pieces, realize the voice interaction function, and provide instant question and answer service for the enterprise masses. The third is to strengthen the application of cutting-edge monitoring and inspection technologies such as big data and cloud monitoring, refine the assessment rules for new government media, and implement the monthly notification system for government websites and new government media work.

  (3) Improve the interaction mechanism between the government and the people

  The first is to expand public participation in policy formulation. For policy documents concerning people’s interests and people’s livelihood, the function of "I want to make suggestions" is set to collect people’s opinions and give play to the role of public participation in the process of policy formulation. The second is to intensify the policy interpretation, and interpret 17 district-level policy documents in an easy-to-understand way, such as illustrated cases, policy questions and answers, videos, etc., so that enterprises can understand and understand them well. Third, we will actively carry out a series of activities of "I do practical things for the masses", hold four "policy public lectures" and 11 "government open days" around optimizing the business environment, improving people’s livelihood and safe production, strengthen the interactive communication between the government and the people, and guide the public to participate in social governance in an orderly manner.

  (D) to strengthen the assessment and supervision.

  Incorporate government information and government affairs disclosure into the performance appraisal scope of the district government, and further optimize the appraisal rules. Carry out third-party evaluation of government information and government affairs disclosure on a quarterly basis, and report the evaluation results. There was no accountability in the whole year.

  Second, the initiative to disclose government information

Active disclosure of government information

  Iii. Receiving and handling applications for government information disclosure

Receiving and handling government information disclosure applications

  Four, the government information disclosure of administrative reconsideration and administrative litigation.

Administrative reconsideration and administrative litigation of government information disclosure

  V. Main Problems and Improvements

  The main problems are as follows: First, the disclosure of government information by various units lacks depth and breadth, and the disclosure ratio of government information concerned by enterprises and the masses is not high. Second, the underlying content management platform system of government websites cannot fully meet the requirements of intelligent and digital applications of government websites. The operation and maintenance management of new government media is not standardized. Third, the staff’s professional ability needs to be improved, and the work norms and standards need to be further strengthened.

  Improvement: First, we will promote the integrated development of government information, government affairs disclosure and government affairs service, combine the disclosure of statutory contents of government information with the disclosure of information needed for handling affairs, and promote the whole process of handling services to fully meet the personalized service needs of handlers. The second is to continuously upgrade and explore the in-depth application of new technologies in the government information disclosure platform, and promote the integrated development of government websites and government new media knowledge bases. The third is to establish a normalization mechanism for government information and government affairs publicity training, form good measures into typical cases, adopt video, offline meetings and other forms of experience exchange, earnestly do a good job in business guidance, and improve the business ability of government information and government affairs publicity staff in all units in the region.

  Vi. Other matters that need to be reported

  This unit collects information processing fees according to the Measures for the Administration of Information Processing Fees for Government Information Disclosure. In 2021, there were 0 pieces of charge notices, with a total amount of 0 yuan. The total amount actually collected is 0 yuan.

Sudden death of 19-year-old female college students in Nanjing dormitory: relatives questioned the cause of death as a mystery

Sudden death in a sophomore girl's dormitory in Nanjing: no injuries on the body surface, excluding electric shock, and the police ruled out the cause of homicide as a mystery

Sudden death of a sophomore girl’s dormitory in Nanjing: no injuries on the body surface, accused of sudden death, police ruled out homicide, relatives questioned the cause of death.

  Sudden death in the dormitory of sophomores: On November 19th, 19-year-old Zhu Ge, a sophomores of Southeast University in Nanjing Jiangning Jiulonghu Campus, was found lying on the ground in the dormitory, looking pale. About half an hour later, the 120 doctors who arrived found that Zhu Ge had no signs of life.

  The reporter learned from the police that the public security organs have ruled out homicide for Zhu Ge’s sudden death. On the 23rd, family members received a notice from the police that Zhu Ge’s autopsy report concluded that he had died suddenly.

Sudden death in a sophomore girl's dormitory in Nanjing: no injuries on the body surface, excluding electric shock, and the police ruled out the cause of homicide as a mystery

Sudden death of a sophomore girl’s dormitory in Nanjing: no physical injuries. Police ruled out homicide of relatives and questioned the cause of death as a mystery.

  Stay alone in the dormitory

  Zhu Ge, a native of Suqian, Jiangsu Province, is a sophomore majoring in financial engineering at Southeast University and the only daughter in her family.

  In the eyes of good friend A Tong (a pseudonym), Zhu Ge is very cheerful, very kind to people and never gets angry. The night before Zhu Ge’s death, she also used WeChat to ask Zhu Ge to watch the movie My Girlhood, but she couldn’t make it because Zhu Ge had to prepare for the exam next week.

  "Zhu Ge’s accident can’t be suicide." A Tong speculated to reporters.

  On November 19th, it was Thursday. At about 7: 30 in the morning, her dormitory, Room 8D132, Meiyuan, and the other three roommates all went to class because they studied other majors. On the morning of the first or second class, Zhu Ge had no class and stayed alone in the dormitory.

  The accounting class she had planned to attend was in the third or fourth period, but she didn’t appear in the classroom. "Teachers in universities generally don’t explain the situation to counselors when they find that students don’t come." The roommate explained this.

  Roommate Chen Lele was the first person to find out the situation. After class at 11: 25 in the morning, she came back from the canteen to buy a meal, took out the key and opened the door. The door was half open, but it couldn’t be opened. It turned out that Zhu Ge was leaning on the door. Surveillance video shows that it was 11: 39 in the morning.

  "I stretched my head and looked in. Her lips were white and her eyes were closed. I quickly knocked on the door of the dormitory next door. No one was there, and then I found my aunt." Chen Lele spoke in a low voice.

  "After 120 arrived, the doctor found that Zhu Ge had no signs of life." As he spoke, his roommates began to cry. Roommates don’t understand that girls who are usually humorous and cheerful will suddenly leave them.

  Harmonious relationship with classmates, the cause of death is a mystery.

  According to the roommate’s memory, the aunt of the boarding house mentioned to them that there were still unfinished cakes and a cup of porridge on Zhu Ge’s table.

  When Zhu Ge died, he was dressed in military green, and his clothes were flat, as usual. However, there is a hot kettle lying on the ground next to Zhu Ge.

  That morning, Zhu Ge was going to wash her hair, and when she left, her roommate Chen Lele also asked. However, the switches in the bathroom are all button-type, not socket-type, so people are unlikely to touch the switch chip. This ruled out the possibility of electric shock.

  "The monitoring at the entrance of the dormitory shows that Zhu Ge went out at 8: 30 and returned to the dormitory in less than 10 minutes." Zhu Ge’s brother-in-law Lin Qingbai told reporters.

  A roommate said that aunt Zhu Ge suspected that she might go out and buy breakfast after washing her hair.

  Lin Qingbai, Zhu Ge’s cousin, said, "When the police arrived at the scene, Zhu Ge was unharmed. However, the police found that Zhu Ge had put a piece of cake on his desk and seemed to have bitten two times. "

  For more details, Lin Qingbai said that he is not very clear. When he arrived, the police had blocked the scene and Zhu Ge’s body was sent to the funeral home.

Selflessness and great love for the motherland —— Two volunteers in Zhengzhou donate hematopoietic stem cells at the same time

  People’s Daily Online, Zhengzhou, October 1 (Wang Pei) On September 30, two caring citizens of Zhengzhou, Sui Xianjie and Fan Xiaojun, donated hematopoietic stem cells at the People’s Hospital of Henan Province at the same time, sending hope of rebirth to two patients with hematological diseases, becoming the 282nd and 283rd hematopoietic stem cell donation volunteers in Zhengzhou and the 795th and 796th hematopoietic stem cell donors in Henan respectively. Throughout September, 16 caring volunteers in Henan successfully donated hematopoietic stem cells, setting a new monthly donation record. On September 20th, 5 volunteers donated, setting a new daily donation record. In September, Henan was full of positive energy.

  Sui Xianjie, who works in Zhengzhou, is 36 years old. In 2011, he joined the database of hematopoietic stem cell donors in China, expecting to contribute his love to save lives one day. After a long wait of 8 years, on June 25, 2019, Sui Xianjie received a notice that he had successfully matched a leukemia patient. At that time, Sui Xianjie was pregnant with her lover, because her family worried that the donation would have an impact, and Sui Xianjie was in a dilemma. After learning from many sources, Sui Xianjie learned that donating hematopoietic stem cells would not affect fertility, so he persuaded his family and won their support and understanding.

  Fan Xiaojun, who is currently working in Xinzheng, is a post-90 s dad. At the age of 27, he is a private enterprise employee. Fan Xiaojun, who is kind by nature, took an active part in all kinds of caring activities when he was in school. On March 16th, 2016, in a voluntary blood donation activity, Fan Xiaojun, who is studying in Zhengzhou Institute of Science and Technology, learned about and joined the information of hematopoietic stem cell donors in China. In July 2019, Fan Xiaojun received a phone call from Zhengzhou Red Cross Society and learned that his initial matching with a blood patient was successful. Although two years have passed, Fan Xiaojun has gone from campus to society and has become a husband and father, but the promise he made during his school days is still in his mind. After receiving the notice, he agreed to donate without hesitation. After successfully passing the processes of high-resolution matching and physical examination, Fan Xiaojun’s donation is scheduled for September 30, 2019. At this time, Fan Xiaojun’s lover is still pregnant with a second child. Although it was busy at home, Fan Xiaojun’s family gave him the greatest support, so that he had no worries.

  The Red Cross Society of Henan Province reminds that if Henan patients need unrelated hematopoietic stem cell transplantation, they can search for matching through seven hospitals including Henan Cancer Hospital, Henan Provincial People’s Hospital, First Affiliated Hospital of Zhengzhou University, Zhengzhou Third People’s Hospital, Luoyang Central Hospital, First Affiliated Hospital of Henan University of Science and Technology and Xinxiang Central Hospital, and the Chinese Bone Marrow Bank will provide free services for all patients.

Process and matters needing attention in test drive of Pentium pony

Explore the test drive tour of Pentium pony: unlock the appointment cheats, store navigation, test drive instructions and exclusive benefits!

1. Appointment in WeChat official account: Pay attention to WeChat official account, the official WeChat of Pentium Pony —— Click the function of "Appointment for Test Drive" —— Enter personal information —— Select the vehicle model, store and test drive time —— After submission, receive a confirmation push with consultant information and test drive precautions.
2. Convenient appointment in official website: Visit the Pentium Pony official website or the official applet-locate the "Appointment Test Drive" module-fill in the basic information-select the vehicle type and test drive location-and wait for the professional team to contact after submission.
3. Third-party platform for automobiles: Search for Pentium Pony models on third-party platforms such as Pacific Auto Network —— find the entrance of test drive reservation on the model details page —— click and fill in the information —— and complete the reservation process.
4, VIP exclusive reservation: Pentium pony VIP customers or members-through the customer service hotline, VIP exclusive APP or WeChat applet to reserve a test drive-enjoy priority test drive arrangements and exclusive offers.
Below is the detailed information of Pentium pony dealer’s store. Contact the store immediately, enjoy their professional service and start your experience journey!
The first store: Hefei Heyuan Pentium, their store contact number is.

Pentium pony appearance

1. Determine whether you meet the test drive requirements, such as whether the driver’s license is over one year, whether the age meets the requirements, and prepare your ID card and driver’s license.
2. Before the test drive, the consultant will introduce the vehicle operation and safety functions, and it is recommended to listen carefully.
3. During the static experience, pay attention to the details such as the interior, space and configuration of the vehicle.
4. During the dynamic experience, pay attention to the details such as the power, handling, comfort and quietness of the vehicle.
5. After the test drive, if you are interested in the vehicle, you can consult the price, preferential activities and financial plan.