Notice on Printing and Distributing the Implementation Plan for the Construction of "Smart Site" in Lishui City (Supplementary)
Counties (cities, districts) Construction Bureau, municipal water supply and drainage company and all units directly under the Bureau:
The "Implementation Plan for the Construction of" Smart Site "in Lishui City" is hereby printed and distributed to you, please conscientiously implement it according to the actual work.
Lishui housing and urban construction bureau
December 9, 2019
(This piece is publicly released)
Issued by the Office of Lishui Housing and Urban-Rural Development Bureau on December 9, 2019
Implementation Plan of "Smart Site" Construction in Lishui City
In order to implement the Opinions of the General Office of the State Council on Promoting the Sustainable and Healthy Development of the Construction Industry (Guo Ban Fa [2017] No.19), the Notice of the Ministry of Housing and Urban-Rural Development on Printing and Distributing the Outline of the Informatization Development of the Construction Industry from 2016 to 2020 (Jian Zhi Han [2016] No.183) and the Notice of the Housing and Urban-Rural Development Department of Zhejiang Province on Accelerating the Construction of "Smart Sites" in the Province (Zhejiang Jian Zhi An Fa Effectively improve the efficiency of industry supervision and service, and improve the fine management level of the construction site in our city. Our bureau decided to immediately carry out the construction of smart sites, and formulated this implementation plan.
I. General requirements
Fully implement the requirements of high-quality development of the construction industry, take improving the engineering quality and safety level and building a harmonious and civilized industry environment as the main line, adhere to the problem-oriented and goal-oriented principles, and use the modern management concept of "wisdom+interconnection+collaboration" to build the subsystems of "smart site" according to local conditions in about two years, gradually realize the full coverage of the city’s "smart site" management system and connect with the province’s "smart site" management system.
Second, the basic situation
(1) Platform functions. Lishui Smart Work Site Platform includes video monitoring management, real-name registration system attendance management, environmental monitoring management, quality supervision and safety supervision, etc. Combined with the requirements of industry supervision functions, it gradually realizes functions such as quality, safety, dust prevention, project progress, personnel management, data statistical analysis and government supervision.
(2) Information collection. Smart site platform mainly collects basic information of enterprises and projects, video monitoring information, attendance information of real-name registration system, environmental monitoring information, quality and safety supervision information, etc., and realizes real-time early warning, task release and disposal based on the same platform, and later provides decision support through big data analysis services.
(3) management authority. Lishui Smart Site Platform is built and managed by the Municipal Construction Bureau in a unified way, and it is opened and applied to the relevant offices (stations) of the Municipal Construction Bureau, the housing construction departments of all districts (cities) and counties, and relevant enterprises and project departments according to the responsibilities and authorities, so as to realize the smart management of the city’s construction projects and improve the quality, safety and civilized construction control level of the city’s construction projects.
(4) Responsibilities of service providers. The network service provider is responsible for assisting the competent business department in daily maintenance of the system platform, network access, system training and site equipment compliance acceptance service. The construction unit and equipment service provider are responsible for the installation and daily maintenance of site equipment, that is, who installs, manages and is responsible.
Third, the construction content
(A) video surveillance
1. Scope of implementation
Since December 10, 2019, the following construction projects must be equipped with an online video surveillance system and connected to the platform:
(1) Projects with a newly started construction area of 5,000 square meters or more after December 10, 2019, including new construction, renovation and expansion of houses; Municipal infrastructure projects with a project cost of 20 million yuan or more.
(2) Construction projects under construction with a construction area of 5,000 square meters or more that have not been accepted by the main branch project before December 10, 2019; Municipal infrastructure projects under construction with a project cost of 20 million yuan or more and a remaining construction period of 6 months or more.
(3) The construction projects listed in Lishui City’s standardized construction site creation plan for building safety and civilized construction, including those newly built or whose main branch projects have not been accepted before December 1.
Meet the above conditions, it is a special project or other special circumstances, the project is located in the construction department for examination and approval, you can not install online video monitoring system.
2. Installation requirements
(1) The number of video monitoring points installed. Housing construction project construction area of less than 20 thousand square meters, not less than 1 ball machine and 3 bolt machines; Housing construction project construction area of 20 thousand square meters and less than 50 thousand square meters, not less than 1 ball machine and 4 bolt machines; For every 50,000 square meters increase in construction area, it is necessary to add another ball machine monitoring point; For projects with complex surrounding environment or large scale, the number of video monitoring points should be increased according to the actual needs of the project, and the specific requirements should be determined by the construction administrative department where the project is located.
(2) Installation position of video monitoring point. The arrangement and installation of video monitoring points should be determined according to the actual situation of the construction site. The main installation positions are as follows: the highest point of the construction site (the installation position of the ball machine), the entrance and exit of the construction site, the vehicle washing pool, the processing area, major hazard sources and other parts. If there is a living area, at least one gun must be installed in the living area, and each entrance with multiple entrances and exits in the construction site should be equipped with a gun monitoring point. The installation position should be the most reasonable and favorable position that can reflect the construction situation of the project. Ensure that the construction status of personnel, major hazard sources and engineering subjects at the entrance and exit of the whole project can be displayed. The installation height should be considered to meet the needs of the whole construction process and reflect the construction status of the main places as much as possible. The monitoring points should be installed at locations that do not need to be moved during construction as far as possible to avoid repeated demolition and reinstallation.
(3) Technical standards and access requirements of video monitoring system. See Annex 1 for the technical standards of video surveillance system. Only qualified equipment can access the platform. See Annex 2 for the interface protocol of video monitoring platform. Monitoring equipment meeting the requirements of technical standards should be adopted in each construction site, and the Municipal Construction Bureau should be contacted for testing and access. Units that have completed the construction in advance should upgrade all kinds of equipment that do not meet this standard to ensure that they can be integrated with the platform.
(2) real-name registration system attendance
1. Scope of implementation
All newly started projects after December 10, 2019 will be connected, and the projects that have started, special projects or other special circumstances are the same as video surveillance requirements.
2. Attendance object
Main management personnel and construction workers of construction and supervision units.
3. real-name registration system attendance equipment installation requirements
(1) Installation quantity and location. The quantity of equipment shall be purchased according to the actual demand of the construction site, and the actual attendance needs shall be met. The equipment shall be installed at the main entrance and exit positions. In order to ensure the equipment identification effect, the installation position shall avoid east-west orientation as far as possible.
(2) real-name registration system attendance equipment technical standards and access requirements. See Annex 3 for the technical standard of attendance equipment in real-name registration system. Only qualified equipment can access the platform. See Annex 4 for the interface agreement of real-name registration system attendance equipment platform. real-name registration system attendance equipment meeting the requirements of technical standards should be adopted in each construction site, and contact the Municipal Construction Bureau for testing and access. Units that have completed the construction in advance should upgrade all kinds of equipment that do not meet this standard to ensure that they can be integrated with the platform.
(3) Environmental monitoring
1. Scope of implementation
(1) Newly started projects covering an area of 5,000 square meters or more after December 10, 2019, including new construction, renovation and expansion of housing construction projects; Municipal infrastructure projects with a project cost of 20 million yuan or more.
(2) Construction projects under construction with a building area of 5,000 square meters or more that have not been accepted by the main branch project before December 10, 2019; Municipal infrastructure projects under construction with a project cost of 20 million yuan or more and a remaining construction period of 6 months or more.
(3) The construction projects listed in Lishui City’s standardized construction site creation plan for building safety and civilized construction, including those newly built or whose main branch projects have not been accepted before December 10th.
Meet the above conditions, it is a special project or other special circumstances, the project is located in the construction (construction) department in charge of examination and approval, you can not install online environmental monitoring system.
2. Collecting parameters
PM10, PM2.5, noise, temperature, humidity, wind power, wind direction and wind speed.
3. Installation requirements of environmental monitoring equipment
(1) Installation quantity requirements. The quantity of equipment shall be purchased according to the actual demand of the construction site, and if the area is within 50,000 square meters, at least one inspection point shall be installed; For every 50,000 square meters of floor space, one more monitoring point will be added. Meet the requirements of municipal infrastructure projects each bid set at least 1 monitoring point. Installed at the main entrance or exit or around the foundation pit.
(2) Installation position requirements. The monitoring equipment shall be installed within the enclosure of the construction site and can directly monitor the main construction area on the site. The on-site spraying system should avoid the on-line monitoring facilities for dust, and should not interfere with the normal monitoring of the monitoring facilities. If one monitoring point is set, it should be set at the main entrance and exit of construction vehicles; If two or more monitoring points are set, at least one of them should be set at the main entrance and exit, and the rest should be set at the field boundary closest to the surrounding sensitive points. When it is adjacent to other construction projects, monitoring points should be avoided at the adjacent boundary.
(3) Technical standards and access requirements of environmental monitoring equipment. See Annex 5 for the technical standards of environmental monitoring equipment. Only the equipment that meets the requirements can access the platform. Refer to Annex 6 for the interface agreement of environmental monitoring platform. Monitoring equipment meeting the requirements of technical standards should be adopted in each construction site, and contact the Municipal Construction Bureau for testing and access. Units that have completed the construction in advance should upgrade all kinds of equipment that do not meet this standard to ensure that they can be integrated with the platform.
IV. Procedures
The installation, use and removal of smart site equipment shall be handled according to the following procedures:
(1) Determine the installation scheme. Network operation service providers go to the construction site for survey, and jointly determine the number of equipment points, installation locations, installation plans, etc. with construction, supervision and construction units; The construction unit shall complete the production of the equipment installation scheme and point layout of the smart construction site in the construction site, fill in the Notice Form for Equipment Installation of Smart Construction Site in Lishui City (Annex 7), and report it to the construction engineering quality and safety supervision institution where the project is located for the record.
(2) Installation and use. With the cooperation of the construction unit, the supervision unit and the construction unit, the network operation service provider installed the special network for the smart site. After the construction unit passed the acceptance, the smart site system was officially put into use. Within one month after the official start of the project, at least two video monitoring points (vehicle washing pool and real-name registration system attendance machine), environmental monitoring equipment and real-name registration system attendance equipment must be installed, and other smart site equipment should be installed in time according to the construction progress.
(3) Modification of the system scheme. No unit or individual is allowed to modify the reviewed smart site plan and smart site equipment layout plan without authorization. If it is really necessary to modify, the construction unit shall apply, and the modification can only be made after the network operation service provider, supervision unit and construction unit audit and report to the construction administrative department where the project is located for approval.
(4) Demolition and relocation. Without the consent of the construction administrative department where the project is located, the construction unit shall not dismantle or move the smart site equipment. If it is necessary to dismantle or move the equipment, the construction unit shall go through the formalities at the construction administrative department where the project is located three working days in advance, and fill in the Notice Form for Equipment Demolition (Relocation) of Lishui Building Engineering Smart Site (Annex 8). With the Notice Form of Equipment Removal (Relocation) of Lishui Smart Construction Site, the network operation service provider will remove or move the dedicated network of smart construction site, and the construction unit shall not remove or move the smart construction site equipment without authorization.
V. Supervision and management
(1) Local construction authorities should regard smart sites as an important starting point for quality and safety supervision, strictly implement them in accordance with the provisions of the implementation measures, and urge those sites that fail to install the smart site system on time, refuse to install the smart site system, and fail to ensure that the smart site system is in good working condition to be rectified in place, so as to promote the smooth implementation of smart sites. Local construction authorities shall supervise the construction sites under construction in real time through the smart site system, and keep account records.
(2) For the construction projects that have started before the implementation of this notice and need to install smart site systems, the equipment installation and system access of all smart site systems should be completed before December 31, 2019.
(III) The construction of smart site is included in the "one-vote veto" of creating a standardized construction site for building safety and civilized construction in Lishui City. In accordance with the requirements of this notice, a site that fails to install or refuses to install the smart site system on time and cannot guarantee that the smart site system is in good working condition may not participate in the standardized construction site for building safety and civilized construction in Lishui City in principle.
(four) local construction authorities shall, within 3 working days after receiving the application for modification or removal of the smart site system, review and reply to the applicant.
(five) local construction departments should complete the construction of local smart site sub-centers before June 30, 2020, and can formulate implementation rules according to this notice.
VI. Maintenance Management
(1) Network operation service providers and equipment service providers that provide smart site system services must ensure the normal operation of smart site systems, diagnose equipment failures in real time and immediately deal with them, and regularly send people to the construction site for maintenance.
(2) The construction unit shall assign a special person to be responsible for the management of smart site systems and equipment, and complete the work of scheme formulation, contract signing and equipment acceptance, and check and make records every day. If abnormal conditions are found, it is necessary to find out the reasons and notify network operation service providers and equipment service providers in time, take effective measures to ensure the safety of facilities and lines in smart construction sites, and actively do a good job in maintaining facilities and lines. If it is found that the monitoring equipment of the smart site is intentionally damaged, the competent construction department where the project is located shall immediately order it to be repaired immediately.
(3) If the smart site system fails, all relevant units should carry out maintenance as soon as possible according to the contract, and in principle, the repair should be completed within 24 hours after receiving the report.
(4) In order to ensure the effective implementation of the smart site, the expenses of online video monitoring system such as leasing, installation, debugging, maintenance and network leasing are included in the expenses of safety protection and civilized construction measures of construction projects, and the funds are special.
(5) Local construction (construction industry) authorities, construction engineering quality and safety supervision institutions, construction units, construction units and supervision units should use the smart site system to realize remote dynamic supervision and management of the construction site. The login website, user account number, password and usage of the smart site system are provided by Lishui Housing and Urban-Rural Construction Planning Bureau and network service providers.
Li Jianfa [2019] No.225 Annex. doc